PROJECT OVERVIEW
GRPS have managed Central Petroleum’s PSV testing, overhaul and recertification for the past 5 years.
During this time, we have built a complete PSV test bench on site at Central Petroleum’s Dingo Field due to the remote nature of the facilities. We also regularly utilise our 40ft and 20ft PSV mobile workshops as this reduces the need to mobilise nitrogen quads for testing. At this site, we complete 1-2 campaigns each year on site regularly utilising 2 PSV technicians, and 4 mechanical/flange technicians to complete 40+ PSVs and all associated flange management within a 7-day window to minimise costs for our client.
Personnel are mobilised from Darwin, Brisbane, and Perth as required to execute these scopes, and all tooling, parts, equipment, and mobile workshop are mobilised from our Darwin facility. We are well setup to provide services within the Northern Territory which has been a key desire of Central Petroleum.
ADDED VALUE
Recently we refaced a DN450 #1500 flange that was found damaged during inspection on a sales gas filter. All works were completed on site by our trained and experienced personnel.